You are not logged in.
I've now fitted the neoprene hatch seals, hooks on the hatches and bungee cords. The plan was to use the neoprene strip provided with the kit but that proved to not compress enough. I've sourced a thinner strip. Now the hatches are secured, I may well take the boat for a canal launch and leave the rigging till later.
Last edited by Rainbow (3 Apr 2015 12:35 pm)
Offline
Toggle made for the backband strap. This will slot through a slit in the hip brace.
Offline
Backband fitted.
Offline
Seat fitted temporarily with Velcro in case I need to adjust the position.
Offline
Carrying toggles fitted.
Offline
Launch photos posted in the Boat Launches section.
Offline
Part of the way through attaching lines and bungee cords. Holes have been drilled through the resin plugs and the tabs then bolted through the deck.
Last edited by Rainbow (2 Jul 2015 9:15 am)
Offline
The final deck rigging is now in place so the build is now complete.
It has taken a while due to only being able to make progress at weekends and having to work around other commitments. I really did enjoy the whole build experience.
Offline
Lovely boat and she will add a sparkle to our East Devon waters! Looking forward to seeing her afloat!
Built a Skerry!
Offline
A beautiful example, well done. Thanks for the log.
Canoe & Kayak Owner
Offline